

Bridge Pier Scour Protection Detailed Survey
In this assignment, BM was tasked with carrying out a detailed inspection of the scour protection zones around the four piers of one of the world’s longest cable-stayed bridges.
The survey was supported by a vessel implementing BM’s self-developed Dynamic Positioning System to overcome the extremely high currents in the survey area. An advanced ROV system, incorporating UHD (4K) cameras and multibeam imaging sonar (MBIS), was utilized to deliver detailed scour survey data correctly referenced in the local coordinate system, with the aid of advanced navigation and positional sensors (DVL & USBL) integrated on the ROV.
A laser scaler embedded on the ROV camera head was employed to facilitate precise measurements of selected findings.
Interested in how our expertise can benefit your project? Let's discuss how we can support your next challenge!

Our client has created a promotional video showcasing their long-term maintenance efforts. BM is proud to have contributed to this project, providing critical inspection and 3D modeling services. Watch the video below!
Address
131 Praxitelous Street, Piraeus 185 32
© Copyright 2024 BMConsulting All Rights Reserved



